31 Aug
|
Stantec Consulting International
|
Winnipeg
31 Aug
Stantec Consulting International
Winnipeg
Performs power system studies, prepares reports, and collaborates with clients on energy transition projects, requiring electrical engineering background and specific modeling tools.
📌 Power Systems Studies Engineer — Transmission Planning - C$74,400 - C$107,900 A Year (Winnipeg)
🏢 Stantec Consulting International
📍 Winnipeg