23 Nov
|
VINCI Construction Grands Projets Canada
|
Pickering
23 Nov
VINCI Construction Grands Projets Canada
Pickering
Deep-Water Intake Group, a joint venture of multiple subsidiaries of the VINCI Group, a worldwide leader in construction and specialized in the design and construction of major civil engineering and building works in Canada, is currently looking for a:
Lifting Supervisor
What is the project?
The Pickering Nuclear Generating Station refurbishment program involves the design and construction of a current deep-water intake in Lake Ontario to improve the plant's cooling system.
The project includes:
- A 1.5 km-long tunnel excavated using a 10.5 m diameter pressurized slurry TBM;
- Two vertical shafts, one onshore and one offshore;
- An offshore modular intake structure resting on the lake bed.
Located in close proximity to an active nuclear generating station, this major infrastructure project requires high standards of safety, planning, coordination and execution.
What you will do
As Lifting Supervisor, you will report to the Lifting Engineer and supervise lifting and hoisting activities in the field.
You will coordinate crane operators, riggers, signallers and subcontractors, verify that lifting operations are ready to proceed and ensure that work is safely executed in accordance with approved lift plans, project procedures and applicable Ontario requirements.
You will have the authority and responsibility to stop any lifting operation when conditions differ from the approved plan or when an unsafe condition, communication failure, equipment issue or unauthorized change is identified.
Your key responsibilities
Safety & Compliance
- Lead daily lifting pre-start meetings and toolbox talks, ensuring lift sequences, roles, hazards, communication methods,
exclusion zones and stop-work expectations are clearly understood.
- Ensure lifting activities comply with the Ontario Occupational Health and Safety Act, Ontario Regulation 213/91, project and client requirements, and approved lifting procedures.
- Verify that approved lift plans, hazard assessments, permits and supporting documents are available and understood before work begins.
- Confirm crane operators, riggers and signallers are competent, authorized and familiar with the planned operation.
- Establish and maintain exclusion zones and stop lifting operations when unsafe conditions, communication failures, adverse weather, ground instability or deviations from the approved plan are identified.
- Report incidents, near misses, equipment damage and dropped-object events and support investigations and corrective actions.
Lifting Operations & Field Supervision
- Supervise lifting operations involving crawler cranes, mobile cranes, boom trucks, forklifts, hoists and other lifting equipment.
- Review approved lift plans and verify loads, weights, centres of gravity, rigging arrangements, lifting points, crane configurations, operating radii, travel paths and landing areas in the field.
- Conduct pre-lift briefings and ensure appropriate communication methods are established.
- Direct lifting operations from crane setup through landing and de-rigging while maintaining effective communication with operators and lifting crews.
- Supervise riggers and signallers and coordinate with construction, engineering, health and safety teams, subcontractors and equipment suppliers.
- Coordinate crane utilization, access, deliveries, simultaneous operations, shift handovers and competing lifting requirements.
- Escalate critical, complex, engineered, multi-crane, blind, personnel, marine/offshore or unusual lifts to the Lifting Engineer and ensure required approvals are obtained before proceeding.
Equipment & Rigging Control
- Verify that crane setup, ground conditions, mats, outriggers, counterweights, boom configuration and operating radius comply with approved lift plans and load charts.
- Identify overhead powerlines, underground services, structures, excavations, traffic and other site constraints and ensure required controls are implemented.
- Verify that lifting equipment and rigging accessories have valid inspections, certifications and traceability and are suitable for the intended load.
- Ensure slings, shackles, hooks, spreader beams and other rigging accessories are correctly used.
- Remove defective, damaged, unidentified or expired lifting equipment from service.
- Monitor equipment condition and subcontractor lifting practices and initiate corrective measures when required.
Documentation & Reporting
- Complete or verify daily lifting pre-start records, lift checklists and field reports.
- Maintain accurate records of lifting activities, equipment, crew allocation, delays, constraints, incidents and corrective actions.
📌 Lifting Supervisor (Pickering)
🏢 VINCI Construction Grands Projets Canada
📍 Pickering