23 Nov
|
PLZ
|
Mississauga
- Check components at start of shift (valves/cans)—verify Item code with Shop Packet
- Every hour and at start of shift check the following:
1. weights of concentrate and propellant
2. pressure
3. vacuum
4. crimp depth & diameter, stem height
5. water bath temperature and water level
6. Test the checkweigher machine using an challenge can checkweigher machine using an challenge can
- Make sure there is water in the water bath maintained at or above 130oF
- Check for dents and dirt
- When using Nitrogen, make sure it is going in the can
- Check batch # with compounding to make sure you have right concentrate, also verify with green release sticker from the lab.
- At the end of a run, do a positive wash-up:
1. clean up filling heads, conveyors, hopper
2.
gas room
3. Fill out Filling Room Cleaning Log
- At the end of a run, remove all cans/valves from the last run
- Fill out Line Set-up Form in the following areas:
1. Inspect Cans/Labels for damage
2. Check codes against batch sheet
3. Concentrate Release Number
4. Sanitation of Surge Tank and Filling Heads Completed
5. Scale Set-up (for tare weight)
6. Line Set-up Purge
7. Water temp between 55°C - 65°C(130°F-154°F).
- No green stickers are to be left on pails.
- Perform other duties as assigned.
📌 Line Operator (Mississauga)
🏢 PLZ
📍 Mississauga