22 Nov
|
FTAI Aviation
|
Montreal
22 Nov
FTAI Aviation
Montreal
Vice-President, Quality Control Location: Montreal, Quebec
ABOUT FTAI AVIATION LTD. (NASDAQ: FTAI) FTAI owns and maintains commercial jet engines, with a focus on CFM56 and V2500 engines. FTAI's proprietary product portfolio, including the Module Factory and a joint venture for the manufacture of PMA engine parts, enables it to offer cost savings and flexibility to its customer base of airlines, lessors, and maintenance, repair and operations (MRO) players. In addition, FTAI owns and leases jet aircraft, which often facilitates the acquisition of engines at favorable prices. FTAI invests in aviation assets and aerospace products generating solid and stable cash flows, with potential for earnings growth and asset appreciation.
FTAI operates globally and has offices in Recent York, Miami, Montreal, Singapore, Dubai, the United Kingdom, and Ireland.
POSITION OVERVIEW The Vice-President, Quality Control is the Person Responsible for Maintenance (PRM) of FTAI's Approved Maintenance Organization (AMO) approved by Transport Canada. This leader assumes responsibility for the airworthiness of each product released by the AMO and reports to the Head of FTAI Canada (accountable executive) to ensure that all maintenance is performed, inspected, recorded, and certified in accordance with the Canadian Aviation Regulations (CARs), the Maintenance Policy Manual (MPM), approved data, and customer requirements.
The role combines hands-on regulatory responsibility with modern, data-driven quality control: digital inspection, real-time compliance indicators, human factors-based error prevention, and a just culture. The Vice-President,
Quality Control works closely with the quality assurance function while remaining independent of it; the latter audits the maintenance control system on behalf of the accountable executive.
Person Responsible for Maintenance (PRM) Functions
Act as the designated PRM in the MPM and maintain Transport Canada Civil Aviation (TCCA) acceptance of this nomination; designate and maintain a qualified alternate PRM for periods of absence.
Ensure that all maintenance performed under the AMO certificate complies with CAR 573 (AMO), CAR 571 (Maintenance), and related standards, and is performed solely within the limits of the AMO's approved ratings and capabilities.
Ensure that maintenance is performed using up-to-date, approved, or acceptable data, including data approved under CAR 521 for repairs and modifications, and engage engineering when no approved data is available.
Ensure that personnel, facilities, tooling, equipment, and data necessary for the scope of work of the AMO are adequate, and stop or restrict work when they are not.
Ensure that findings raised by the quality assurance program and by TCCA are subject to effective and timely corrective actions; be responsible for corrective action plans for findings pertaining to the maintenance control system.
Be responsible for the content of the MPM sections governing maintenance control, inspection, and return to service; submit revisions for TCCA approval as needed.
Ensure that Service Difficulty Reports (SDRs)
and other mandatory reports are submitted to TCCA and type certificate holders within required timelines.
Act as the primary point of contact with TCCA inspectors for maintenance matters, and support certificate renewals, capability list changes, and rating modifications.
Key Responsibilities Chief Inspector Oversight
Directly supervise the Chief Inspector, who manages daily inspection activities; set objectives, evaluate performance, and ensure that the Chief Inspector has the authority, personnel, and resources necessary to fulfill their role.
Approve inspection procedures, standards, and stop-work points established by the Chief Inspector, and ensure they are reflected in the MPM.
Review the Chief Inspector's recommendations regarding the issuance, renewal, limitation, or withdrawal of inspection and certification authorizations.
Ensure that the Chief Inspector's role, responsibilities, and stop-work authority are defined in the MPM, and that a qualified delegate replaces them in their absence.
Hold regular reviews with the Chief Inspector covering inspection findings, unrevealed defects, workload, and resources, and elevate systemic issues to the Head of FTAI Canada (accountable executive).
Prepare the Chief Inspector to become a potential alternate PRM.
Product Inspection and Compliance
Through the Chief Inspector, ensure that receiving, in-process, final, and independent inspections are performed to defined standards across all product lines.
Ensure that returns to service (certification after maintenance) are signed only by personnel holding valid and up-to-date authorizations for the certified work.
Supervise non-destructive t
📌 Vice-President, Quality Control (Montreal)
🏢 FTAI Aviation
📍 Montreal