22 Nov
|
Toronto Hydro
|
Winnipeg
22 Nov
Toronto Hydro
Winnipeg
Shape Toronto Hydro’s future grid in Toronto through power-system analysis, capacity assessment, and integrated investment planning in a hybrid setting.
This Engineering Manager leads long-term planning for distribution stations, feeders, and area systems. The position directs complex studies, establishes planning criteria, and develops alternatives addressing growth, electric vehicles, storage, and major customer connections. Recommendations must remain technically credible, risk-based, and practical.
Key Responsibilities
Establish planning horizons, assumptions, scenarios, and study criteriaDirect power-system studies identifying constraints and performance risksIntegrate station, feeder, and area-system requirementsCompare technically viable alternatives,
including non-wires solutionsSupport regulatory applications, business cases, and stakeholder engagementsRequirements: Strong distribution planning and power-system study knowledgeExperience with load forecasting and scenario planningExperience converting studies into defensible investment recommendationsProfessional Engineer designation in OntarioExperience leading multidisciplinary studies and technical deliverablesBring sound engineering judgment and power-system expertise to Toronto Hydro’s distribution planning, investment timing, and grid modernization work. #J-18808-Ljbffr
📌 Power Systems Engineering Manager Toronto (Winnipeg)
🏢 Toronto Hydro
📍 Winnipeg