22 Nov
|
Vale Base Metals
|
Winnipeg
22 Nov
Vale Base Metals
Winnipeg
Use deep cost engineering expertise in Toronto to shape estimates, forecasts, and investment support for Vale Base Metals’ Canadian studies.
This Senior Specialist position serves as the estimating and cost control technical leader for Canadian mining studies. You will validate capital and operating estimates, challenge assumptions, and maintain consistent cost baselines. The scope spans Preliminary Economic Assessments, Pre-Feasibility Studies, and Feasibility Studies.
Key Responsibilities
Review, validate, reconcile, and benchmark study-phase cost estimatesChallenge quantities, productivity, indirect costs, contingency, escalation, and exchange ratesDefine estimate execution plans and required study deliverablesLead estimate workshops supporting project and investment decisionsDevelop benchmarks, historical databases,
productivity metrics, and cost intelligenceRequirements:
At least 15 years in cost engineering or capital project deliveryMining, metals, energy, infrastructure, industrial, or asset-intensive experienceStrong understanding of AACE practices and estimate classificationsExperience with PRISM, Cleopatra, Aspen, Candy, Primavera P6, SAP, or Power BIStrong analytical, facilitation, communication, and stakeholder management capabilitiesBring cost engineering leadership and analytical rigor to estimates that guide Vale Base Metals’ Canadian investment decisions.
#J-18808-Ljbffr
📌 Senior Cost Engineer Mining Studies Toronto (Winnipeg)
🏢 Vale Base Metals
📍 Winnipeg