19 Nov
|
PLZ
|
Mississauga
- Check components at start of shift (valves/cans)—verify Item code with Shop Packet
- Every hour and at start of shift check the following:
1) weights of concentrate and propellant
2) pressure
3) vacuum
4) crimp depth & diameter, stem height
5) water bath temperature and water level
6) Test the checkweigher machine using an challenge can checkweigher machine using an challenge can
- Make sure there is water in the water bath maintained at or above 130oF
- Check for dents and dirt
- When using Nitrogen, make sure it is going in the can
- Check batch # with compounding to make sure you have right concentrate, also verify with green release sticker from the lab.
- At the end of a run, do a positive wash-up:
1) clean up filling heads, conveyors, hopper
2)
gas room
3) Fill out Filling Room Cleaning Log
- At the end of a run, remove all cans/valves from the last run
- Fill out Line Set-up Form in the following areas:
1) Inspect Cans/Labels for damage
2) Check codes against batch sheet
3) Concentrate Release Number
4) Sanitation of Surge Tank and Filling Heads Completed
5) Scale Set-up (for tare weight)
6) Line Set-up Purge
7) Water temp between 55°C - 65°C(130°F-154°F).
- No green stickers are to be left on pails.
- Perform other duties as assigned.
📌 Line Operator (Mississauga)
🏢 PLZ
📍 Mississauga