· Check components at start of shift (valves/cans)—verify Item code with Shop Packet · Every hour and at start of shift check the following:
- weights of concentrate and propellant
- pressure
- vacuum
- crimp depth & diameter, stem height
- water bath temperature and water level
- Test the checkweigher machine using an challenge can checkweigher machine using an challenge can
· Make sure there is water in the water bath maintained at or above 130oF
· Check for dents and dirt
· When using Nitrogen, make sure it is going in the can
· Check batch # with compounding to make sure you have right concentrate, also verify with green release sticker from the lab.
· At the end of a run, do a valuable wash-up:
- clean up filling heads, conveyors, hopper
- gas room
- Fill out Filling Room Cleaning Log
· At the end of a run, remove all cans/valves from the last run
· Fill out Line Set-up Form in the following areas:
- Inspect Cans/Labels for damage
- Check codes against batch sheet
- Concentrate Release Number
- Sanitation of Surge Tank and Filling Heads Completed
- Scale Set-up (for tare weight)
- Line Set-up Purge
- Water temp between 55°C - 65°C(130°F-154°F).
· No green stickers are to be left on pails.
· Perform other duties as assigned.
📌 Line Operator (Ontario)
🏢 PLZ
📍 Ontario