Construction Schedule Coordinator (Canada)

Construction Schedule Coordinator (Canada)

11 Nov
|
PipeFlo Contracting
|
Canada

11 Nov

PipeFlo Contracting

Canada

Company Overview

PipeFlo Contracting Corp. is outfitted with the latest trenchless robotic technology and equipment for pipeline inspection, maintenance and rehabilitation of water distribution and wastewater collection systems and industrial process piping.

PipeFlo is a construction contractor focused on installation of specialized trenchless technologies designed and manufactured in Europe & USA for infrastructure repair:
Mainline Full Length Lining (BKP Germany) – UV Cured in Place Pipe
Lateral Lining (Speedylite Spain)– LED Cured in Place Pipe
Robotic Inspection & Cutter (ProKasro Germany) – Pipeline milling robot
Spot Repair & UV Top Hat Systems (Cosmic Austria)– UV Cured Short Liner (pipeline point repair)
Chemical Grouting and Sealing Repairs (CUES USA)– non-structural process to stop infiltration into mainline joints service connections and maintenance holes
Amex Seals (Amex Sanivar Germany)- Internal pipe sealing for joints and leaks
Channeline (Dubai)- GRP structural panel lining for large diameter pipe rehabilitation
CentriPipe (USA) - Centrifugally Cast Concrete Pipe Lining
Permaform (USA) - Cementitious structural liner for maintenance hole renewal
Primus Line (Germany) - Inner coating optimal system for pressure pipes

Job Tasks

- Plan, direct and manage all aspects of assigned construction project, ensuring customer satisfaction, safety, quality, production, and efficiency by preparing next day’s schedule via B2W platform, and monitoring project progress
- Establish production goals to meet the technical specifications of the identified pipeline robotics technology by recording results in Daily Production Log, and in B2W platform.




- Communicate with clients to assist in the decision making for most economical and best practice results available and providing updates and micro-schedules to clients.
- Project Coordinator (team member) who is responsible to maintain Daily Production Log for all field operation crews. Identify site and equipment problems, NCR must be completed.
- Discuss jobsite events & forecast for the status of projects at Daily Operations meeting
- Ensure a sound knowledge of PipeFlo Corporate Policies and Procedures Health and Safety COR Program
- Ensure field staff complete proper documents for submission

Skill Requirements:

- Proficient with B2W Operations Suite
- Proficient with CT Spec Pipeline Inspection Software and Cloud Platform
- Excellent written, verbal, and electronic communication skills
- Strong organizational, administrative, and quality management skills
- Ability to multi-task, prioritize and work on multiple projects simultaneously

Qualifications:

- NASSCO PACP (Pipeline Assessment Certification Program)
- College Diploma OR University Degree in Project Management OR Civil Engineering
- At least 1 year in experience for management of Trenchless Technology UV CIPP from initial pipe inspection, robotic repair, through to final video and proof of completion
- Comprehension of international trenchless technology products, and pipeline repair techniques
- Comprehension of Safe Job Procedures and timeline required to complete tasks for creation of daily production schedules
- Understand architectural and engineering drawings and specifications
- Ability to communicate in fluent English with all stakeholders in project

Job Types: Full-time, Permanent

Pay: $29.00 per hour

Perks:

- Dental care
- Extended health care
- Vision care

Application question(s):

- Please provide your current NASSCO PACP Certificate Number

Work Location: In person

📌 Construction Schedule Coordinator (Canada)
🏢 PipeFlo Contracting
📍 Canada

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: construction schedule coordinator (canada) / canada

Subscribe to this job alert:

Get the latest job offers by email for: construction schedule coordinator (canada) / canada