Evap Shutdown Pipeline Labourer — Camp-Based, Overtime (Lac la Biche)

Evap Shutdown Pipeline Labourer — Camp-Based, Overtime (Lac la Biche)

11 Nov
|
Portage College
|
Lac la Biche

11 Nov

Portage College

Lac la Biche

LSC Industrial is seeking experienced Pipeline Labourers for an upcoming 11-day Evap shutdown project at Kirby Camp (Jackfish Camp). Start date is November 24th with travel on November 23rd.

The role offers a camp-based arrangement with daily bussing to and from the site and a safety-first culture. Shifts run Monday–Thursday with 10-hour days (plus overtime and travel time) and Friday–Sunday with 12-hour shifts (plus overtime and travel time).

#J-18808-Ljbffr

📌 Evap Shutdown Pipeline Labourer — Camp-Based, Overtime (Lac la Biche)
🏢 Portage College
📍 Lac la Biche

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: evap shutdown pipeline labourer — camp-based, overtime (lac la biche) / lac la biche

Subscribe to this job alert:

Get the latest job offers by email for: evap shutdown pipeline labourer — camp-based, overtime (lac la biche) / lac la biche