Apply hydraulic simulation and pipeline data analysis at TC Energy through a hybrid Student Intern assignment supporting natural gas operations.
This Student Intern position supports pipeline operations, integrity work, and outage planning activities. You will use hydraulic models, analyze operating data, maintain pressure monitoring plans, and assist outage coordinators. The work provides exposure to natural gas transmission, pipeline hydraulics, stakeholder coordination, and outage management. The term runs from May 2027 through August 2028.
Key Responsibilities: Use hydraulic models to determine pressure monitoring points
Analyze historical data for safe excavation pressures
Maintain operating plans and pressure monitoring alarms
Support NGTL and Foothills system outage execution
Maintain shipper plant turnaround information
Requirements: Currently enrolled in Chemical or Mechanical Engineering
Currently in third year of studies
Complete an academic term before May 2027
Return to full time studies after the work term
Work full-time, 40 hours weekly, throughout the term
Develop pipeline hydraulics, operating data analysis, and outage planning skills while supporting safe, reliable TC Energy operations.