Snow removal is to be done at the Base Camp (near paintball field) before 8:00 AM. This could include plowing the lake road from GDS mill to the entrance of the Base Camp and Base Camp Road. Including shoveling entrances into the Base Camp trailer. Salt for driveway and exits Salt and sand on the road entering the Base Camp and parking lot when needed Hourly Contract: Snow removal of dumped areas - twice during the season, if needed #J-18808-Ljbffr