Transmission Planning Power Systems Studies Engineer - $74,400 - $107,900 A Year - Remote (Winnipeg)

Transmission Planning Power Systems Studies Engineer - $74,400 - $107,900 A Year - Remote (Winnipeg)

16 Oct
|
Stantec.
|
Winnipeg

16 Oct

Stantec.

Winnipeg

Performs power system modeling and studies using PSS/E, PSLF, ASPEN for transmission planning, including power flow, transient, and short circuit analysis. Prepares reports and collaborates with clients.

📌 Transmission Planning Power Systems Studies Engineer - $74,400 - $107,900 A Year - Remote (Winnipeg)
🏢 Stantec.
📍 Winnipeg

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: transmission planning power systems studies engineer - $74,400 - $107,900 a year - remote (winnipeg) / winnipeg

Subscribe to this job alert:

Get the latest job offers by email for: transmission planning power systems studies engineer - $74,400 - $107,900 a year - remote (winnipeg) / winnipeg