03 Aug
|
Artemis Gold - Blackwater Project
|
British Columbia
03 Aug
Artemis Gold - Blackwater Project
British Columbia
BW Gold is seeking a Drill Operator for the Blackwater Mine site. The role involves safely operating DTH drilling rigs, performing equipment inspections, and maintaining logs while working on a 2 weeks on / 2 weeks off rotation in a remote camp.
You will join a safety‑driven team committed to high performance and continuous improvement, with responsibilities spanning on‑site operation, record keeping, and cooperative field work.
#J-18808-Ljbffr
📌 Drill Operator – Mining (2 Weeks On / 2 Off) (British Columbia)
🏢 Artemis Gold - Blackwater Project
📍 British Columbia